Multifunctional warehouse | Business Park Borchwerf II
Multifunctional warehouse with an area of approximately 6,784 sq m.
This warehouse is located on business park Borchwerf II, a short distance from the slip road to the A17 and near the fly-over to the A58. There are plenty of public facilities around the site, including a McDonalds, De Beren restaurant and Delifrance.
Business park Borchwerf II is located in the heart of the Benelux, between the Randstad and the Flemish Diamond. This makes business park Borchwerf II and Roosendaal/Oud Gastel as a whole a very attractive region. The world ports of Moerdijk, Rotterdam and Antwerp are a short distance away. Moreover, with its nearly 80,000 inhabitants, Roosendaal has an excellent labour pool.
Location
The premises is located in business park Borchwerf II, a short distance from the ramp to the A17 motorway and near the fly-over to the A58. There are plenty of public facilities around the property, including a McDonalds, De Beren and Delifrance restaurants.
Do not hesitate to contact us about this warehouse.
Surface area
-
The total surface area is approx. 6,782 sq m, diveded as follows:
-
Warehouseapprox. 5,700 sq m
-
Officeapprox. 520 m²
-
Mezzanineapprox. 563 sq m
Facilities
-
Warehouse
-
Free stacking height of 14 mFire hose reels, fire alarm and evacuation system
-
Column span of 12m x 23mHigh efficiency LED intelligent lighting system
-
Floor load warehouse 5,000 kg/m², max. point load 80 kNPublic heating system (heat network) (18 °C);
-
Flatness floor warehouse complies with class 2 of NEN 27476 loading docks, loading capacity 6,000 kg dynamic, 9,000 kg static
-
Floor load dispatch area (first 24m) 5,000 kg/m², max. point load 80 kN1 automated, electric door on ground floor
-
Concrete plinth, height 2.3 mColumn protectors in dispatch area
-
Certified ESFR SprinklerRoof is being prepared for solar panels
-
-
Office
-
Representative entranceSanitary facilities
-
Finished floors, walls, ceilingsCertified ESFR sprinkler
-
Public heatingFire hose reels, fire alarm and evacuation system
-
Energy efficient recovery systemCable ducts for data cabling
-
Intellignet LED lighting systemKitchenette on ground- and first floor
-
-
Mezzanine
-
Floor depth of 12mFloor load 500 kg/m²
-
Finished floor of mezzanine structure built approx 7.2 m above warehouse floorWindows for natural light
-
Clear height above level mezzanine floor at least approx. 4.50 mSteel balustrade
-
Clear height mezzanine floor and the structure is min. approx. 4.50 m
Other conditions
-
Parking spaces68 on site parking spaces
-
Rentupon request
-
Service chargesto be determined
-
Lease termto be determined
-
Notice period12 months
-
Paymentsrent, service charges and VAT quarterly in advance
-
SecurityBankguarantee of 3 months
-
OtherLease on basis ROZ Febr. 2015
-
Availabilityto be discussed