Logistics warehouse to be realised | Businesspark Midden-Limburg
A new to realize logistics warehouse, modern and fully equipped and designed by Heembouw architects. The environmental permit has been granted. This very high quality logistics new build development, with a total surface area of approximately 11,600 m², will be located at an excellent visible location on the A73 at the Midden-Limburg business park.
This newly realised warehouse is characterised by its efficiency but with a very high-quality appearance.
The property provides for the latest (sustainability) aspects that may be expected of a modern logistics warehouse, including smart technological solutions for a conducive working environment and efficient, greener and future-oriented business operations.
Located along A73
This logistics warehouse will be built on the Business Park Midden Limburg https://oml.nl/portfolio/businesspark-midden-limburg/ in Echt, on a prominent sight location along the A2/A73 at the Het Vonderen junction. Businesspark Midden Limburg is strategically located a very short distance from the slip roads and exits of both national highways and is therefore easily accessible via the A2 towards Eindhoven and Maastricht and the A73 towards Venlo and Nijmegen. The German and Belgian hinterland and the port area of Antwerp are also easily accessible via these motorways.
Inland waterway transport can be quickly handled via Barge Terminal Born, located less than fifteen minutes from the development. Air freight facilities can be used at nearby Maastricht Aachen Airport (20 min.) or the airports of Brussels (90 min.) or Düsseldorf (50 min.). For regular flights, Eindhoven Airport can be added. Considering the different modalities at short distance, one can speak of a multimodal location!
For more information please contact us.
Surface area
-
Warehouseapprox. 9,245 m²
-
Officeapprox. 739 m²
-
Mezzanineapprox. 1,630 m²
-
If required, the office space can be further extended by approx. 235 m² GLA on the first floor.
Parking spaces
-
Parking spacesapprox. 95
-
Truck parking5
Solar panels
-
The building is being prepared for the installation of solar panels.
Facilities
-
Warehouse
-
• Free stacking height of 12.2 m¹• Loading docks fitted with bumpers and wheel guidance system
-
• Smooth concrete floor, floor load 50 kN/m²• 2 dock doors for vans
-
• Expedition floor load 25 kN/m²• ESFR sprinkler system
-
• Monolithic concrete floor Zeile 4 according to DIN 18.202• LED-lighting
-
• Point load 90 kN• Gasless
-
• 8 loading docks for trucks• Per 2,500 m² combi box (400V/230V/16A) for general use
-
• Hydraulic dock levellers (dynamic load 60 kN);• BREEAM Very Good with a GPR score of 8
-
-
Office
-
• Ground floor entrance with very good finishing level• Sprinkler system
-
• Exclusive pantry block (lessee's preference)• Lift (for multi-storey office)
-
• Sanitary group per floor;• Fire and evacuation system, fire hose reels
-
• Wall ducts for telephone and data cabling• Concrete floors with floor screed
-
• Climate system (VRF-system)• Finished architectural walls
-
• LED-lighting;
Other conditions
-
AvailabilityIn consultation.
-
IndexationAnnualy based on the consumer price index (CPI), all households series (2015 = 100), published by the Central Bureau for Statistics (CBS).
-
Service chargesThe advance payment for service costs as well as the package of supplies and services is to be determined.
-
PaymentsRent, service charges and VAT paid quarterly in advance.
-
SecuritySecurity of at least three months' rent including service charges and VAT, depending on the (financial) due diligence of the tenant.
-
Other conditionsLease agreement based on the standard lease agreement (ROZ) model February 2015.