Built-to-suit Logistics Campus | Unit E 20,000 m² | VGP Park
unit E – Built-to-suit logistics campus
At business park Park15 Logistics, developer/investor VGP offers this built-to-suit (BtS) logistics campus of over 160,000 m², to be divided into four warehouses. Part of the environmental permit is already irrevocable, in addition we can guarantee power supply! The realisation of approx. 20,000 m², unit E, can start immediately!
VGP Park Nijmegen is part of Park15 Logistics, located in the heart of the Arnhem-Nijmegen region. The total development of this entire area comprises over 300,000 m² once completed.
Located at intersection North-South and East-West routes
VGP Park Nijmegen is one of the few locations in the middle-eastern part of the Netherlands where large-scale logistics and distribution centres can be developed and built. Located at the end of the A15 zone near the German border, VGP Park Nijmegen and the built-to-suit warehouse benefit from its location at the intersection of North-South and East-West routes such as the A15 (Maasvlakte – Nijmegen), A50 (Eindhoven – Arnhem) and A73 (Nijmegen – Venlo) motorways.
Near container terminal and future rail terminal
Park15 has all the ingredients to become a multimodal transport hub, as it already has a container terminal on the main branch of the river Waal (Rhine) and there are plans for a rail terminal on the Betuweroute, right next to the logistics park. This will provide a direct rail link to Rotterdam and the European hinterland.
Several renowned parties have already preceded you, including AH’s home shopping centre, Nippon Express, OTC Medical, AG Transport and ESTG.
Feel free to contact us for more information about unit E.
Surface area
-
Unit Eapprox. 19,500 m² (irrevocably licensed)
-
Office space as well as mezzanine can be realised according to the lessee's wishes in consultation with the lessor.
Rent
-
To be agreed. We will gladly work out a tailor-made proposal for you.
Availability
-
Building permit for unit E has been granted irrevocably. You may expect about 10 months of construction time after agreement. Building permit for D, F and G in process. Power present and no nitrogen obstructions.
Facilities
-
Warehouse
-
BREEAM 'Very Good'Multiple skylights
-
Free stacking height min. 12 mFloor flatness DIN 18202, tabel 3, line 4
-
Concrete plinth with sandwich panels aboveConcrete floor max. floor load 7,000 kg/m²
-
Concrete support structureLED-lighting
-
Ample loading docks with levelersCertified sprinkler
-
-
Office
-
Can be built in as required by the tenantFloor covering
-
Conditioned by VRF systemAmple sanitary facilities
-
System ceiling with mineral fibre panelsPantry connection
Other conditions
-
Rent adjustmentAnnually, based on change monthly index acc to CPI series CPI-All Households (2015)
-
Service chargesTo be agreed
-
PaymentsRent, service charges and VAT quarterly in advance
-
SecurityOf at least 5 months rent incl. service charges and VAT
-
OtherLease based on model of Raad voor Onroerende Zaken (ROZ) model February 2015