A73 Logistics Centre | 30,000 m² | Horst/Venlo
The A73 Logistics Centre is a new development opportunity located on the A73 motorway, between the logistics hotspots of Venlo and Venray. This warehouse to be built comprises a total of approx. 30,000 m², with a possibility of splitting into two units from approx. 12,000 m². Possible tenant requirements can be discussed. The building will have the BREEAM-NL certification ”Very Good”, with among other things LED, sufficient electric charging posts for electric cars and solar panels.
Location A73 Logistics Centre
The new development is located at a visible location next to the A73, which offers a direct connection to Nijmegen, Maastricht and Aachen. The A67 motorway towards Eindhoven, Tilburg, Rotterdam and Antwerp is 15 minutes away by car. The rail and barge terminal are both less than 15 minutes away. The fact that the building lies between the logistics hotspots of Venlo and Venray makes it a strategic location.
From the A73 Logistics Centre, the Benelux countries are within reach.
There is a bus stop approximately 350 meters from the warehouse with a connection to the train/bus station of both Venray and Venlo.
Please contact us for more information about the A73 Logistics Centre.
Surface area
-
The total surface area is approx. 29,371 sqm. Divided as follows:
-
Warehouse Aapprox. 11,700 sqm
-
Warehouse Bapprox. 14,900 sqm
-
Office (in consultation)approx. 1.000 sqm
-
Mezzanine (in consultation)approx. 1.770 sqm
Lease term
-
To be agreed.
Rent
-
To be agreed.
Facilities
-
Clear height 11.40 metersLED lighting
-
Floor load warehouse 50 kN/m²Level floor in accordance with NEN2747 Class 4
-
Floor load expediton zone 25 kN/m²Fire alarm system
-
Point load 85 kN/m²Fire extinguishing facilities
-
1 loading dock per 1,000 sqmCertified sprinkler installation
-
1 overhead door per 10,000 sqmMezzanine: depth 12 m
-
Column spacing (grid) at 22.40 m x 12.00 mRepresentative finished office space.
-
-
Outside area
-
Fully fenced-in outside area145 parking spaces on site
-
Electrically operated sliding gate
Other conditions
-
AvailabilityConstruction started, ready in December 2023!
-
IndexationAnnually based on the consumer price index (CPI), all households series (2015 = 100), published by the Central Bureau for Statistics (CBS).
-
Service chargesThe advance payment for service costs as well as the package of supplies and services is to be determined.
-
PaymentsRent, service charges and VAT paid quarterly in advance.
-
SecuritySecurity of at least three months' rent including service charges and VAT, depending on the (financial) due diligence of the tenant.
-
Other conditionsLease agreement based on the standard lease agreement (ROZ) model February 2015.