Da Vincistraat 1-3

2652 XE Berkel en Rodenrijs

Logistics

For rent

EUR 60,- per sqm per year

Please contact us

Warehouse | 20.000 m² | Rotterdam region | available November

Silk Route 21 Campus is located in the center of the Rotterdam & The Hague metropolitan area, at Business Park Oudeland. This business park has a very good accessibility through provincial roads, that access the highways A20, A13 and A12 within 5 km. Because of the central location, the metropole region Rotterdam-Haaglanden (with 2.3 million residents) is extremely fit for E-commerce activities.

Within 15 minutes from Rotterdam center and half an hour to the center of The Hague, and right off the exit of the future A16/A13 of which the construction has started and will be in use by 2024. Randstad Rail Station ‘Rodenrijs’ is just a couple of car minutes away.

Specific characteristics:

  • Center of Metropole Region Rotterdam – the Hague
  • Along highways A16 – A13 – A20 and A12
  • 5 minutes from Rotterdam – the Hague Airport
  • Nearby a residential area
  • Triple AAA Location

Surface area

  • warehouse
    Unit C: 11.045 sqm
  • Unit D: 8.880 sqm
  • mezzanine
    Unit C: 952 sqm
  • Unit D: 730 sqm
  • office
    Unit C: 525 sqm
  • Unit D: 515 sqm

Rental price

  • warehouse
    EUR 60,-- per sqm per year excluding VAT
  • mezzanine
    EUR 30,-- per sqm per year excluding VAT
  • offices
    EUR 130,-- per sqm per year excluding VAT
  • parking places
    EUR 400,-- per place per year excluding VAT

Rental terms

  • lease term
    5 years
  • payment
    quarterly in advance
  • guarantee
    a quarter rent plus service charges and VAT
  • indexation
    annually based on CPI index 2015

Facilities

  • Warehouse:
  • clear height 12,2 m
    1 dock door per 1.000 sqm
  • span & column grid suitable for both small and wide aisles
    dock equipped with docklevellers (60kN dynamic load), shelter and bumper bars
  • 1 ground level acces door (4m x 4,7m) per unit
    maximum point load pallet racking: 80kN/foot
  • floor load: 50kN/sqm
    insulated concrete plinth with a height of 2,5m
  • flatness tolerance: according to DIN18202, Table 3, Zeile 4 (5mm/2m)
    certified automatic sprinkler installation (ESFR roof sprinklers)
  • fire hose and hydrants in compliance with local regulations and building code
    fire alarm and evacuation system in compliance with the rules and code
  • heating (12°) and ventilation system
    lighting: energy efficient LED
  • Mezzanine:
  • floor load of 10kN/sqm
    window for natural light
  • mezzanine with a depth of 24m above expedition area
  • Offices:
  • offices on ground floor and mezzanine level with an open floor plan
    pantry with integrated fridge, stainless steel sink and dishwasher
  • high-end VRF system for cooling and heating
    lighting: energy efficient LED, 500 Lux at worktable level
  • high-end finishing
  • Site:
  • Perimeter fencing (2m) with automated entrance gate
    loading area 40m deep, designed for heavy loads
  • exterior lighting for loading area, circulation roads and park yards
    parking yard for cars and truck & trailer parking

Da Vincistraat 1-3

2652 XE Berkel en Rodenrijs